Certifications, test reports and declarations — all on the proof hub.
Silicate Systems
Contact

Material and carbon calculator

Answer three questions. Find out the required quantities per layer and the carbon impact of the floor.

01Floor area
02Where are you starting from?
03How will the floor be used?

Your build-up

  • Step 1 · Prime
    0.15–0.20 kg/m² on concrete / screed
    EMICODE EC1PLUSMD-26095-EN ↗TDS ↗
  • Step 2 · Pour the floor
    approx. 1.8 kg/m² per mm—
    approx. 1.8 kg/m² per mm
    EMICODE EC1PLUSMD-26094-EN ↗TDS ↗
  • Step 3 · Protect
    150–300 g/m² (min. 150 g/m²)—
    150–300 g/m² (min. 150 g/m²)